Battery Bank Replacement (Small Scale) | Client: Delta Electronics (for Indus Towers Sites)
Deployment of Skilled Telecom Field Technicians (Manpower)
Rural Water Supply Network: HDPE Pipeline Laying in Hard Rock Strata and Installation of 150+ Functional Household Tap Connections (FHTC).
Major Infrastructure Project for High-Diameter DI Pipeline (300mm to 600mm) Laying, Hydro-testing, and Extensive Road Restoration.
Construction of 225 KL OHT & 550 KL MBR with Manual HDPE Pipeline Laying and Commissioning Works.
Project Title: Execution of DI Pipeline (150mm to 250mm) Laying, Jointing, and Valve Chamber Construction including CC Road Restoration.
PRJ-1358 | CLOSED | Will be open 2 days
STIPL Project : IT Asset Relocation & Installation | Hydrabad
PRJ-652 | CLOSED
HFCL LTD-ZS | PIPE LINE LAYING | FHTC | RESTORATION
HFCL-ZS-CIVIL PROJECT UPE BOUNDARY WALL CONSTRUCTION
CONSTRUCTION PROJECT HFCL LTD GHAZIPUR UTTAMPUR BLOCK AVAILABLE
HFCL-SC-OHT CONSTUCTION(ZINK ALLUMINIUM TANK)
Allocated Shyam | fd